CASES

Jiayuguan Dayou 2×33000KVA industrial silicon ore heating furnace and supporting flue gas waste heat power generation project

04 Jun,2025

33000KVA Industrial Silicon and Waste Heat Power Generation Section IX (Cooling Water System)

Dinglun Energy Technology flywheel energy storage 1X30MW project mechanical ventilation tower (dry cooling system)

04 Jun,2025

Dinglun Energy Technology Flywheel Energy Storage 1X30MW Engineered Mechanical Draft Cooling Tower (Cooling Water Dry Cooling System) - Flywheel Energy Storage Project

Shanxi Ankeng New Energy's 3.69 million tons/year dry quenching coke project, 2 x 30MW (Asia's largest dry quenching coke project in operation)

30 Apr,2025

Compound cooling (cement platform, evaporative cooling enabled above 25℃, ensuring environmental temperature of 35℃—25KPa operation)

Shanxi Sunshine Coking Dry Quenching Coke Waste Heat Power Generation 1×30MW Unit Concrete Platform (12 Columns, 6 Wind Turbines)

30 Apr,2025

In August 2023, two units were put into commercial operation one after another

Jiangna Xinjiang Hami Runda Power Generation 2×135MW units, double-truss steel platform (4 circular columns and 9 wind turbines per unit)

30 Apr,2025

Jiangna Xinjiang Hami Runda Power Generation 2×135MW units, double-truss steel platform (4 circular columns and 9 wind turbines per unit)
< 12 >

How can we assist you?

If you are interested in our products, please leave your contact information

Service Hotline:

+86-351-5697288

Address:

Block A, Guoan Building, Second Lane, Dongcheng Road, Xiaodian District, Taiyuan City, Shanxi Province

Shanxi Dewang Energy Saving Technology Co., Ltd.    Powered by 300.cn | Privacy Policy    

Business License